Results &
Independent Validation.
Spin Echo has undergone independent validation under laboratory and pilot conditions aligned to real operating environments. We prioritize physics level evidence to ensure measurement integrity in the field.

Validation Scope
Validation activities were conducted on full scale hardware under controlled laboratory and pilot conditions.
Signal Stability
Verification of NMR resonance signal stability across varied temperature and pressure envelopes. Validation focuses on the maintenance of a stable physical reference under industrial conditions.
Signal Separation
Assessment of phase resolved signal separation. Tests confirm the ability of the system to differentiate molecular signatures of oil, gas, and water within a single measurement volume.
Transient Response
Observation of measurement behavior under transient and compositionally variable flow conditions, including response times during rapid regime changes and slugging events.
Facility Testing
Use Case Aligned Validation
DNV Groningen

Validation of hydrogen and methane gas mixtures was conducted at DNV Groningen utilizing a specialized Joint Industry Project flow loop. Testing verified composition measurement integrity for emerging energy value chains.
Cranfield University

Validation of multi phase flow behavior was performed at Cranfield University utilizing the industrial scale multi phase flow loop. Studies focused on phase resolved measurement accuracy across three phase riser configurations.
TÜV SÜD Glasgow

Validation of NGL and condensate rich flow was conducted at the TÜV SÜD National Engineering Laboratory in Glasgow. Testing focused on identifying molecular signatures within complex, high value liquid streams.
Technical Audit Portfolio
Detailed validation methodologies, facility test reports, and specific performance datasets are available to qualified partners under NDA following technical consultation.